Tuesday, October 28, 2008
Track update
Here are the first slots cut into the track. Viewing turns 6 and 7. Elliptical routing technique is being employed for smooth turn entry and exit.
Also, the Pyramid PS26KX power supply has arrived. 6-15 volt variable regulated DC power. Track construction is full swing. Controllers and 1/32nd cars are on the horizon.
Sunday, October 12, 2008
More NRP
Subscribe to:
Posts (Atom)